Press Release
September 2012 and FY2012 1st Half スポーツベット入金不要ボーナス Generated and Purchased (Preliminary Report)
October 10, 2012Chubu Electric スポーツベット入金不要ボーナス Co.,Inc.
Overview of September 2012
- The volume of スポーツベット入金不要ボーナス generated and purchased declined YOY, ending at 98.6% of the volume of the same period one year ago.
Overview of FY2012 1st half
- The volume of スポーツベット入金不要ボーナス generated and purchased increased YOY, ending at 100.4% of the volume of the same period one year ago.
1.Volume of スポーツベット入金不要ボーナス generated and purchased
| September |
FY2012 1st half total |
|
|---|---|---|
スポーツベット入金不要ボーナス generated and purchased |
11,526 |
68,290 |
Internally generated スポーツベット入金不要ボーナス Breakdown :Hydro スポーツベット入金不要ボーナス |
545 |
4,745 |
Internally generated スポーツベット入金不要ボーナス Breakdown :Thermal スポーツベット入金不要ボーナス |
10,449 |
61,879 |
Internally generated スポーツベット入金不要ボーナス Breakdown :Nuclear スポーツベット入金不要ボーナス |
0 |
0 |
Internally generated スポーツベット入金不要ボーナス Breakdown :Wind スポーツベット入金不要ボーナスsolar
スポーツベット入金不要ボーナス |
3 |
23 |
Received from other sources |
529 |
1,643 |
2.Maximum スポーツベット入金不要ボーナス monthly three-day average
| September |
1st half |
|
|---|---|---|
Maximum スポーツベット入金不要ボーナス three-day average(% of previous year) |
23,380 |
24,570 |
*Calculated by taking the average from the three days within the applicable month on which the highest volume of electricity is recorded.
The maximum スポーツベット入金不要ボーナス three-day average for FY2012 1st half occurred in July.
3.Flow rate
| September |
1st half |
|
|---|---|---|
Flow rate |
64.2 |
93.3 |
*Water supply rate = (Volume of hydro-generated electricity/Average hydro-generated electricity for past 30 years) ×100
Results greater than 100% denote high water flows; results less than 100% denote low water flows.
4.Rate of use of nuclear facilities
| September |
1st half |
|
|---|---|---|
Rate of use of nuclear facilities |
0.0 |
0.0 |
*Hamaoka Nuclear スポーツベット入金不要ボーナス Station
Reactor No. 3 operations have been suspended since November 29, 2010 (periodic inspection)
Reactor No. 4 operations suspended from May 13, 2011(periodic inspections from
January 25, 2012)
Reactor No. 5 operations suspended from May 14, 2011(periodic inspections from
March 22, 2012)