September 2015 and FY2015 1st Half スポーツベッティング合法 Generated and Purchased (Preliminary Report)

October 08, 2015
Chubu Electric スポーツベッティング合法 Co.,Inc.

Overview of September 2015

  • The volume of スポーツベッティング合法 generated and purchased declined YOY, ending at 99.3% of the volume of the same period one year ago.

Overview of FY2015 1st half

  • The volume of スポーツベッティング合法 generated and purchased declined YOY, ending at 99.3% of the volume of the same period one year ago.

1. Volume of スポーツベッティング合法 generated and purchased

(Unit: GWh)

September

FY2015 1st half total

スポーツベッティング合法 generated and purchased
(% of previous year)

10,683
(95.3)

65,460
(97.0)

Internally generated スポーツベッティング合法 Breakdown :Hydro スポーツベッティング合法
(% of previous year)

1,051
(86.8)

5,743
(104.8)

Internally generated スポーツベッティング合法 Breakdown :Thermal スポーツベッティング合法
(% of previous year)

8,278
(97.3)

53,643
(98.3)

Internally generated スポーツベッティング合法 Breakdown :Nuclear スポーツベッティング合法
(% of previous year)

0
(Does not apply)

0
(0.0)

Internally generated スポーツベッティング合法 Breakdown :Wind スポーツベッティング合法solar スポーツベッティング合法
(% of previous year)

4
(37.0)

27
(69.9)

Received from other sources
(% of previous year)

1,350
(85.4)

6,047
(75.9)

2. Maximum スポーツベッティング合法 monthly three-day average

(Unit: MW)

September

1st half

Maximum スポーツベッティング合法 three-day average(% of previous year)

20,490
(90.1)

24,780
(93.0)

*Calculated by taking the average from the three days within the applicable month on which the highest volume of electricity is recorded.

3. Flow rate

(Unit: %)

September

1st half

Flow rate

139.4

114.0

*Water supply rate = (Volume of hydro-generated electricity/Average hydro-generated electricity for past 30 years) ×100
Results greater than 100% denote high water flows; results less than 100% denote low water flows.

4. Rate of use of nuclear facilities

(Unit: %)

September

1st half

 Rate of use of nuclear facilities

0.0

0.0

*Hamaoka Nuclear スポーツベッティング合法 Station
Reactor No. 3 operations have been suspended since November 29, 2010 (periodic inspection)
Reactor No. 4 operations suspended from May 13, 2011(periodic inspections from January 25, 2012)
Reactor No. 5 operations suspended from May 14, 2011(periodic inspections from March 22, 2012)

The chart of Air temperature in Nagoya (September), Volume of スポーツベッティング合法 generated and purchased vs. previous year

Go to the Top of the Page